Frequently asked questions

AI data

I want to update the AI data (abstraction, discharge, reservoir/impoundment)
Contact Tim Cross (NRW Lead User) to discuss or to request higher access level. It is recommended that changing AI data is undertaken within the staging system first to check the results look sensible before implementing in the main system. Note if the location of an impoundment, abstraction or discharge is moved u/s or d/s of a LDG, WHS have to run a script to re-naturalise the LDG. Contact WHS in this instance

Gauging Stations

I want to remove a gauging station from being a Local Data Gauge (LDG)
Contact Tim Cross (NRW Lead User) to discuss or to request higher access level. It is recommended that changing the status of a LDG is undertaken within the staging system first before implementing in the main system
I want to 'upgrade' an existing gauging station in Qube to be a Local Data Gauge (LDG)
Contact Tim Cross (NRW Lead User) to discuss or to request higher access level. WHS used specific criteria to determine if a GS is suitable to be a LDG and NRW reviewed the list when Qube was launched so refer to the comments in this before changing anything - see https://cyfoethnaturiolcymru.sharepoint.com/:x:/r/teams/waterman/hwr/sof/Qube/Pre-roll%20out%20preparation/NRW_gstn_data_prep_17Dec19-postNRWcomments.xlsx?d=w37245742abdf4d0fbe5205077605e32f&csf=1&web=1. It is recommended that changing AI data is undertaken within the staging system first to check the results look sensible before implementing in the main system.Tim to check with WHS if they need to run any script to naturalise that gauging station once upgraded.

Issues

I have identified an issue/problem with Qube
In the first instance contact Tim Cross (NRW Lead User) who will act as a single point of contact with WHS. If Tim is not available, please contact Wallingford HydroSolutions using software@hydrosolutions.co.uk

Login

I have forgotten my email
Contact us
I have forgotten my password
Use the link on the login page

Map

How do I zoom the map
Use the mouse wheel

Training

How do I create a batch job to export multiple estimates at once?
See training video https://cyfoethnaturiolcymru.sharepoint.com/:v:/r/teams/waterman/hwr/sof/Qube/Training/Qube%20batch%20processing-20220203_143414-Meeting%20Recording.mp4?csf=1&web=1
I need to access the Skype demo/training session
See https://cyfoethnaturiolcymru.sharepoint.com/teams/waterman/hwr/sof/Qube/Training/Qube%20demo%20training%20-%2021%20May%202020%2013.34.36.mp4?csf=1&web=1.&cid=07d76876-4bb5-488a-89f1-746e8db93a12